OverviewDaily Task ScheduleTech StackMetrics
◉Home☰Schedule⚙Tech★Metrics↑Top
← Back to Calendar
Friday, October 9, 2026

Harbour Gallery, Thin-Client Rollout & Duplex Plan

Restructured the harbour project's media gallery into a featured banner plus CTA thumbnails, applied the corrected thin-client firewall code at the site root, and added a Duplex Residence card to the 4 BHK pricing tab.
Frontend Backend Deployment
3
Tasks Completed
11
Files Deployed
0
Regressions

Task Summary

Technical Details

Deployment & Verification

Targeted (not full-folder) deploys were used to avoid overwriting diverged runtime state, with md5 verification and headless-browser measurement of banner and CTA geometry at desktop and mobile.

11 files deployed | md5 match | gallery grid 3-col desktop / stacked mobile

Issues Found & Resolved

A full-folder sync was avoided because the live state had diverged; the site's anti-bot layer blocked headless verification (expected behaviour); and the Duplex card reused existing plan artwork to avoid introducing a 404.

Work Done Using Premium AI Chatbot

AI-Assisted Tools

Claude Pro Perplexity Pro