OverviewDaily Task ScheduleTech StackMetrics
◉Home☰Schedule⚙Tech★Metrics↑Top
← Back to Calendar
Monday, October 12, 2026

Boulevard Lead Port, Pricing Grid & Verification

Ported the pricing and CTA-blocks sections from the flagship project into the boulevard project, adapted the cards to the real floor-plan artwork, set a two-per-row desktop grid, and fixed leads not reaching the external sync endpoint — verified end-to-end.
Backend Frontend Lead Capture Deployment
3
Tasks Completed
20
Files Deployed
1
Lead Flow Verified

Task Summary

Technical Details

Deployment & Verification

Two SSH/SFTP deploy scripts (content blocks and floor plans), md5 verification, a remote syntax lint, and live checks of tab counts, image loads and the lead modal.

20 files deployed | md5 match | syntax lint clean | lead flow: record ID returned

Issues Found & Resolved

Floor-plan images 404'd after the first deploy until the referenced set was uploaded; the site's visit limiter tripped under verification and the blocked entry was cleaned; and legacy multi-endpoint lead routing was retired in favour of the sync endpoint.

Work Done Using Premium AI Chatbot

AI-Assisted Tools

Claude Pro Gemini Advanced GPT-4 Turbo